Operations Management MCQs Set 1

Operations management is the work of making goods and delivering services — turning materials, people, machines and information into products customers want, on time and at a fair cost. Every factory, hospital, shop and delivery service is an operation, and how well it is planned and run decides whether it succeeds.

This set of 100 multiple choice questions covers operations management from start to finish. You will find questions on the fundamentals of operations, on production planning and process design, on quality, capacity and inventory control, and on operations strategy and current issues such as Industry 4.0, robotics and global trade.

Each question has four options and one correct answer, followed by a short explanation. Read each question carefully, choose your answer, and then check the explanation to learn why it is right. These questions will help students, job seekers and working professionals who want to understand how businesses produce goods and deliver services.

Operations Management Fundamentals

1. What is the input-transformation-output model in operations management?

  • A) A model that shows how a firm raises money from investors
  • B) A model that shows how operations turn inputs such as materials, people and information into finished goods and services
  • C) A model that shows how customers are attracted by advertising
  • D) A model that shows how prices are set in a market

Answer: B) A model that shows how operations turn inputs such as materials, people and information into finished goods and services — The transformation model is the basic idea of operations: inputs go into a process, the process transforms them, and outputs come out.

2. What are the four Vs of operations?

  • A) Value, velocity, volume and victory
  • B) Volume, variety, variation and visibility
  • C) Vendors, vehicles, volume and variety
  • D) Vision, values, variety and volume

Answer: B) Volume, variety, variation and visibility — The four Vs describe an operation: how much it produces (volume), how many different things it makes (variety), how much demand changes (variation), and how much customers see of the operation (visibility).

3. What is an order winner in operations?

  • A) A prize given to the best salesperson
  • B) A document that confirms an order
  • C) A rule that decides which order is made first
  • D) A feature that makes customers choose one firm's product over a rival's

Answer: D) A feature that makes customers choose one firm's product over a rival's — Order winners are the features that win the customer's order, such as a lower price, faster delivery or better quality than rivals.

4. What is an order qualifier in operations?

  • A) A feature that makes a product the most expensive in the market
  • B) A test that checks whether a worker is qualified
  • C) A certificate that proves a product is genuine
  • D) A feature a product must have before customers will even consider buying it

Answer: D) A feature a product must have before customers will even consider buying it — Order qualifiers are the minimum features a product must have to be considered at all; without them, customers will not even look at the product.

5. What are the five operations performance objectives?

  • A) Price, promotion, place, product and people
  • B) Planning, organising, staffing, directing and controlling
  • C) Profit, growth, market share, sales and return on investment
  • D) Quality, speed, dependability, flexibility and cost

Answer: D) Quality, speed, dependability, flexibility and cost — Operations are judged on five objectives: doing things right (quality), doing them fast (speed), doing them on time (dependability), changing easily (flexibility) and doing them cheaply (cost).

6. What is dependability as an operations performance objective?

  • A) Making products as cheaply as possible
  • B) Changing the product range very quickly
  • C) Producing the largest possible volume
  • D) Delivering goods and services on time, as promised, every time

Answer: D) Delivering goods and services on time, as promised, every time — Dependability means customers can rely on the operation: orders arrive when promised, so customers can plan with confidence.

7. What is flexibility in operations?

  • A) The ability of an operation to change what it does, how much it makes, or when it delivers, quickly and cheaply
  • B) The ability of a worker to work longer hours
  • C) The ability of a machine to run without stopping
  • D) The ability of a firm to borrow money easily

Answer: A) The ability of an operation to change what it does, how much it makes, or when it delivers, quickly and cheaply — Flexibility lets an operation cope with change — new products, different volumes or urgent orders — without long delays or high costs.

8. What is speed as an operations performance objective?

  • A) How fast a machine can run at full power
  • B) How quickly a firm can raise its prices
  • C) How fast workers can walk around a factory
  • D) How quickly an operation responds to customers, from the order to delivery

Answer: D) How quickly an operation responds to customers, from the order to delivery — Speed is the time between a customer asking for something and receiving it; faster operations usually please customers and hold less stock.

9. How do goods differ from services?

  • A) Goods are always expensive and services are always cheap
  • B) Goods are made by machines and services are made by hand
  • C) Goods can only be sold in shops and services only online
  • D) Goods are tangible products that can be stored, while services are intangible acts that are used as they are produced

Answer: D) Goods are tangible products that can be stored, while services are intangible acts that are used as they are produced — A good is a physical thing you can touch, keep and store; a service is an act or performance that is produced and used at the same time, such as a haircut.

10. What are service operations?

  • A) Operations that produce intangible services rather than physical goods
  • B) Operations that only serve the government
  • C) Operations that repair broken machines
  • D) Operations that sell goods at a discount

Answer: A) Operations that produce intangible services rather than physical goods — Service operations, such as banks, hospitals and hotels, produce services — things customers experience rather than own.

11. How does the front office differ from the back office in a service?

  • A) The front office is the part customers see and interact with, while the back office is the hidden work that supports it
  • B) The front office is where managers sit and the back office is where workers sit
  • C) The front office handles money and the back office handles goods
  • D) The front office is open at night and the back office during the day

Answer: A) The front office is the part customers see and interact with, while the back office is the hidden work that supports it — In a hotel, the reception desk is the front office and the laundry and kitchen are the back office; customers judge the service by the front office, but it depends on the back office.

12. How do high-contact services differ from low-contact services?

  • A) High-contact services involve much direct contact between staff and customers, while low-contact services involve very little
  • B) High-contact services are always expensive and low-contact services are always cheap
  • C) High-contact services are provided by large firms and low-contact services by small firms
  • D) High-contact services use machines and low-contact services use people

Answer: A) High-contact services involve much direct contact between staff and customers, while low-contact services involve very little — A hospital is high-contact because staff work closely with patients; a postal service is low-contact because customers rarely meet the staff.

13. What is a service encounter?

  • A) A meeting where managers plan the service
  • B) A chance meeting between two customers
  • C) A moment when a customer interacts directly with the service, such as talking to staff or using a website
  • D) A test that checks whether a service works

Answer: C) A moment when a customer interacts directly with the service, such as talking to staff or using a website — Each service encounter — a phone call, a check-in, a delivery — shapes what the customer thinks of the service, so encounters must be managed well.

14. What is the customer contact model in service operations?

  • A) The idea that customers should never contact the firm
  • B) A list of all the firm's customers
  • C) The idea that the more direct contact customers have with the operation, the less efficient it is, so contact should be designed carefully
  • D) A model that counts how many customers visit each day

Answer: C) The idea that the more direct contact customers have with the operation, the less efficient it is, so contact should be designed carefully — Chase's customer contact model says high-contact services are harder to make efficient, because customers bring variety and uncertainty into the process.

15. What is the service process matrix?

  • A) A way of sorting services by how much labour they use and how much customers take part, into four types such as service factory and professional service
  • B) A chart that shows the price of every service
  • C) A list of all the services a firm offers
  • D) A method for counting customers in a queue

Answer: A) A way of sorting services by how much labour they use and how much customers take part, into four types such as service factory and professional service — Schmenner's service process matrix groups services by labour intensity and customer interaction — for example, airlines are service factories and lawyers are professional services.

16. What is servitization?

  • A) When a firm stops making products and only provides services
  • B) When a manufacturer adds services to its products, such as maintenance, leasing or advice, so it sells a solution instead of just a product
  • C) When a service is turned into a physical product
  • D) When a firm advertises its services on television

Answer: B) When a manufacturer adds services to its products, such as maintenance, leasing or advice, so it sells a solution instead of just a product — Servitization means a maker of machines also sells servicing, training and support, so customers buy the result — such as printed pages — rather than the machine itself.

Production Planning and Process Design

17. What is multifactor productivity?

  • A) Output divided by the number of workers only
  • B) Output divided by a bundle of inputs together, such as labour plus materials plus energy
  • C) Output divided by the money spent on advertising
  • D) Output divided by the number of machines only

Answer: B) Output divided by a bundle of inputs together, such as labour plus materials plus energy — Multifactor productivity looks at several inputs at once, so it shows how well the whole operation uses its resources, not just one input.

18. What is partial productivity?

  • A) Output divided by all inputs together
  • B) Output divided by one single input, such as labour or materials
  • C) The productivity of a factory that is only partly built
  • D) The output of a worker during part of the day

Answer: B) Output divided by one single input, such as labour or materials — Partial productivity measures one input at a time — for example, labour productivity is output per worker, and material productivity is output per unit of material.

19. What is total factor productivity?

  • A) Output divided by the total number of products made
  • B) The productivity of every factory in a country added together
  • C) Output divided by the total cost of raw materials only
  • D) Output divided by all inputs combined, usually labour and capital, showing the overall efficiency of the operation

Answer: D) Output divided by all inputs combined, usually labour and capital, showing the overall efficiency of the operation — Total factor productivity compares output with all the main inputs together, so it shows whether the operation as a whole is getting more efficient.

20. What does an operations manager do?

  • A) Sells the firm's products to customers
  • B) Keeps the firm's accounts and prepares tax returns
  • C) Designs the firm's advertisements and brand image
  • D) Plans, organises and controls the day-to-day work that produces goods and services, and improves how it is done

Answer: D) Plans, organises and controls the day-to-day work that produces goods and services, and improves how it is done — Operations managers run the production process — they plan capacity, schedule work, manage quality and stock, and look for better ways of working.

21. How do strategic, tactical and operational decisions differ in operations?

  • A) Strategic decisions are made by workers, tactical decisions by customers, and operational decisions by suppliers
  • B) Strategic decisions set long-term direction, tactical decisions plan the medium term, and operational decisions run the daily work
  • C) Strategic decisions are about money, tactical decisions about people, and operational decisions about machines
  • D) Strategic decisions are made once a year, tactical decisions once a month, and operational decisions once a week

Answer: B) Strategic decisions set long-term direction, tactical decisions plan the medium term, and operational decisions run the daily work — Strategic decisions, such as building a new factory, shape the future; tactical decisions, such as monthly plans, put strategy into action; operational decisions, such as today's schedule, keep work moving.

22. What are competitive priorities in operations?

  • A) The performance goals an operation focuses on to beat rivals, such as low cost, high quality, fast delivery or flexibility
  • B) The list of rival firms in the market
  • C) The order in which customers are served
  • D) The priorities of the sales team for the year

Answer: A) The performance goals an operation focuses on to beat rivals, such as low cost, high quality, fast delivery or flexibility — A firm chooses which performance objectives matter most to its customers — for example, a budget airline competes on cost, while a courier competes on speed.

23. What is a trade-off in operations?

  • A) Swapping products with another firm
  • B) Selling goods in one country and buying them in another
  • C) Giving up performance on one objective, such as cost, to improve another, such as flexibility, because both cannot be best at once
  • D) Changing suppliers to get a lower price

Answer: C) Giving up performance on one objective, such as cost, to improve another, such as flexibility, because both cannot be best at once — Operations often face trade-offs: making products very cheaply may mean they cannot be customised quickly, so managers must choose what matters most.

24. What is a focused factory?

  • A) A factory that makes every product the firm sells
  • B) A factory that concentrates on a narrow set of products or tasks so it can do them very well
  • C) A factory that only works during the day
  • D) A factory that has no managers

Answer: B) A factory that concentrates on a narrow set of products or tasks so it can do them very well — Wickham Skinner argued that a factory trying to do everything does nothing well, so a focused factory limits its range and excels at what it does.

25. What is the product-process matrix?

  • A) A framework that matches the type of product — from one-off to continuous — with the best type of process, from job shop to continuous flow
  • B) A chart that shows the price of each product
  • C) A list of all the products a firm makes
  • D) A method for counting how many products are defective

Answer: A) A framework that matches the type of product — from one-off to continuous — with the best type of process, from job shop to continuous flow — The Hayes-Wheelwright matrix says one-off products suit job shops, batches suit batch processes, and high-volume standard products suit mass or continuous processes.

26. What is batch production?

  • A) Making one unique product at a time
  • B) Making goods in groups, where a set of identical items is produced together before the next group starts
  • C) Making goods without stopping, day and night
  • D) Making goods only after a customer orders them

Answer: B) Making goods in groups, where a set of identical items is produced together before the next group starts — In batch production, such as baking bread or printing books, a batch of one item is finished before the equipment is changed for the next batch.

27. What is continuous production?

  • A) Making goods in a non-stop flow, 24 hours a day, with no breaks between units
  • B) Making goods only when customers order them
  • C) Making one product at a time by hand
  • D) Making goods in small groups that change every day

Answer: A) Making goods in a non-stop flow, 24 hours a day, with no breaks between units — Continuous production suits products such as oil, chemicals and electricity, which flow through the process without stopping.

28. What is intermittent production?

  • A) Production that never stops for any reason
  • B) Production that starts and stops, making different products in separate runs rather than flowing continuously
  • C) Production that only happens at night
  • D) Production that makes only one product forever

Answer: B) Production that starts and stops, making different products in separate runs rather than flowing continuously — Intermittent production, such as job shops and batch work, stops between runs so the equipment can be reset for the next product.

29. What is repetitive production?

  • A) Making the same standard products over and over again in large volumes on a line
  • B) Making a different product every time
  • C) Making products only once a year
  • D) Repeating the same mistake in production

Answer: A) Making the same standard products over and over again in large volumes on a line — Repetitive production, such as assembling cars or phones, repeats the same steps for identical products, which keeps costs low and quality steady.

30. What is make-to-stock?

  • A) Producing goods only after a customer has paid
  • B) Producing goods that are never sold
  • C) Producing goods from old stock
  • D) Producing goods in advance and holding them in stock, so customers can buy them immediately

Answer: D) Producing goods in advance and holding them in stock, so customers can buy them immediately — Make-to-stock suits standard products with steady demand, such as soap or soft drinks, because finished goods are ready on the shelf.

31. What is make-to-order?

  • A) Making goods in advance and storing them
  • B) Ordering raw materials before planning production
  • C) Starting production only after a customer places an order, so each product is made for a known buyer
  • D) Making goods that customers have not asked for

Answer: C) Starting production only after a customer places an order, so each product is made for a known buyer — Make-to-order suits custom or expensive products, such as tailored suits or industrial machines, because nothing is made until a customer orders it.

32. What is assemble-to-order?

  • A) Assembling products before any customer orders them
  • B) Ordering parts after the product is delivered
  • C) Keeping standard parts in stock and assembling them into the final product only when a customer orders it
  • D) Assembling products by hand only

Answer: C) Keeping standard parts in stock and assembling them into the final product only when a customer orders it — Assemble-to-order, used for computers and cars with options, combines fast delivery with choice: parts are ready, but the final product is built to the customer's order.

33. What is engineer-to-order?

  • A) Ordering engineers to work faster
  • B) Designing and making a product from scratch for one specific customer, starting only after the order is placed
  • C) Making products from an old design
  • D) Engineering a product that is never sold

Answer: B) Designing and making a product from scratch for one specific customer, starting only after the order is placed — Engineer-to-order suits unique projects such as bridges or special machines, where design work begins only when the customer orders.

34. How does job production differ from batch production?

  • A) Job production is faster than batch production
  • B) Job production uses machines and batch production uses people
  • C) Job production makes one unique item at a time, while batch production makes a group of identical items together
  • D) Job production is cheaper than batch production

Answer: C) Job production makes one unique item at a time, while batch production makes a group of identical items together — A wedding dress is job production — one unique item; a run of 500 identical shirts is batch production — a group of the same item made together.

Quality, Capacity and Inventory Control

35. What is production planning and control (PPC)?

  • A) The work of selling finished goods
  • B) The work of hiring production workers
  • C) The work of designing a new factory building
  • D) The work of planning what to produce, when and in what order, and then checking that production follows the plan

Answer: D) The work of planning what to produce, when and in what order, and then checking that production follows the plan — PPC covers routing, scheduling, loading and dispatching, and then follows up to make sure work is done on time and to the plan.

36. What is routing in production planning and control?

  • A) Deciding how finished goods are delivered to customers
  • B) Deciding which workers take which holidays
  • C) Deciding how much raw material to buy
  • D) Deciding the path a job follows through the factory — which machines and operations it passes through, and in what order

Answer: D) Deciding the path a job follows through the factory — which machines and operations it passes through, and in what order — Routing lays out the sequence of operations for a job, so everyone knows where the work goes next and what must be done at each step.

37. What is dispatching in production planning?

  • A) Sending finished goods to customers
  • B) Dismissing workers who are late
  • C) Giving the order to start a job and releasing the materials, tools and instructions needed to do it
  • D) Cancelling a production order

Answer: C) Giving the order to start a job and releasing the materials, tools and instructions needed to do it — Dispatching is the starting signal: the job card, materials and drawings are issued so work on a job can begin.

38. What is expediting in production?

  • A) Speeding up machines beyond their safe limit
  • B) Delivering goods by air instead of by road
  • C) Paying workers extra to work faster
  • D) Following up jobs in progress to make sure they are on time, and taking action when they fall behind

Answer: D) Following up jobs in progress to make sure they are on time, and taking action when they fall behind — Expediting, also called follow-up, tracks jobs through the factory and chases up delays so the schedule is kept.

39. What is sequencing in production planning?

  • A) Deciding how many machines to buy
  • B) Deciding the colour of the products
  • C) Deciding the order in which jobs are done on a machine or workstation
  • D) Deciding where the factory should be built

Answer: C) Deciding the order in which jobs are done on a machine or workstation — Sequencing puts jobs in order — for example, by earliest due date — so machines are used well and orders finish on time.

40. What is the shortest processing time (SPT) rule in sequencing?

  • A) Doing the longest job first
  • B) Doing the quickest job first, so more jobs finish early and average waiting time falls
  • C) Doing the most urgent job first
  • D) Doing jobs in the order they arrived

Answer: B) Doing the quickest job first, so more jobs finish early and average waiting time falls — SPT puts the job with the smallest processing time first; it cuts the average time jobs spend waiting, though long jobs may wait.

41. What is the earliest due date (EDD) rule in sequencing?

  • A) Doing first the job whose promised delivery date is nearest, so fewer orders are late
  • B) Doing first the job that arrived first
  • C) Doing first the quickest job
  • D) Doing first the job with the highest profit

Answer: A) Doing first the job whose promised delivery date is nearest, so fewer orders are late — EDD orders jobs by their due dates, which helps keep promises to customers and reduces the number of late deliveries.

42. What is Johnson's rule in sequencing?

  • A) A rule for hiring the best workers
  • B) A method for setting the price of a product
  • C) A rule for ordering raw materials
  • D) A method for ordering jobs through two machines or work centres so the total time to finish all jobs is as short as possible

Answer: D) A method for ordering jobs through two machines or work centres so the total time to finish all jobs is as short as possible — Johnson's rule sorts jobs by their processing times on the first and second machine, giving the shortest total flow time for two-machine work.

43. What is setup time in production?

  • A) The time a machine runs at full speed
  • B) The time needed to prepare a machine or workstation for a new job, such as changing tools and settings
  • C) The time workers spend on holiday
  • D) The time needed to deliver finished goods

Answer: B) The time needed to prepare a machine or workstation for a new job, such as changing tools and settings — Setup time is the changeover between jobs; long setups waste capacity, so firms try to cut them, for example with SMED.

44. What is SMED in operations?

  • A) A machine that makes products very slowly
  • B) A method for counting defective products
  • C) Single-minute exchange of die — a method for cutting setup and changeover times to under ten minutes
  • D) A type of raw material

Answer: C) Single-minute exchange of die — a method for cutting setup and changeover times to under ten minutes — SMED, from lean thinking, separates setup work that can be done while the machine runs from work that needs it stopped, so changeovers become much faster.

45. What is demand planning in operations?

  • A) Telling customers what they should buy
  • B) Working out how much customers will want, when and where, so production, stock and staffing can be planned
  • C) Planning how to advertise a product
  • D) Planning the price of a product

Answer: B) Working out how much customers will want, when and where, so production, stock and staffing can be planned — Demand planning turns sales history and market knowledge into a forecast of future demand, which drives production and inventory plans.

46. What is the chase strategy in production planning?

  • A) Changing production and the workforce to match demand each period, so stock stays low but hiring and overtime vary
  • B) Producing the same amount every period and letting stock rise and fall
  • C) Ignoring demand and producing at random
  • D) Producing only when stock runs out

Answer: A) Changing production and the workforce to match demand each period, so stock stays low but hiring and overtime vary — A chase strategy follows demand up and down, hiring or using overtime when demand rises and cutting back when it falls, so finished stock stays low.

47. What is the level strategy in production planning?

  • A) Changing production every day to match orders
  • B) Producing nothing during quiet periods
  • C) Producing at a steady rate every period and using stock to cover the ups and downs of demand
  • D) Producing only the products that are most profitable

Answer: C) Producing at a steady rate every period and using stock to cover the ups and downs of demand — A level strategy keeps output and the workforce steady; stock builds up when demand is low and is used up when demand is high.

48. What is Little's Law in operations?

  • A) The rule that the average number of items in a system equals the arrival rate multiplied by the average time each item spends in the system
  • B) A law that limits how many workers a factory can employ
  • C) A rule that says stock should always be kept low
  • D) A law about the price of goods

Answer: A) The rule that the average number of items in a system equals the arrival rate multiplied by the average time each item spends in the system — Little's Law links three measures — work in process, throughput rate and flow time — so knowing two lets a manager work out the third.

49. What is throughput time in production?

  • A) The time a machine runs at full speed
  • B) The number of units a factory makes each hour
  • C) The total time a unit spends in the production system, from the moment work starts on it to the moment it is finished
  • D) The time workers spend on their lunch break

Answer: C) The total time a unit spends in the production system, from the moment work starts on it to the moment it is finished — Throughput time, also called flow time, covers waiting, processing, moving and inspection time — cutting it makes delivery faster and stock lower.

50. What is a bill of materials (BOM)?

  • A) A bill sent to a customer for goods delivered
  • B) A list of all the workers in a factory
  • C) A document that shows the price of a product
  • D) A list of all the parts, materials and quantities needed to make one unit of a product

Answer: D) A list of all the parts, materials and quantities needed to make one unit of a product — The BOM is like a recipe for a product: it lists every component and how much of it is needed, so purchasing and production know what to get and use.

51. What is the cost of poor quality (COPQ)?

  • A) The price customers pay for a poor product
  • B) The costs a firm bears because its quality is poor — rework, scrap, warranty claims and lost customers
  • C) The cost of advertising a poor product
  • D) The wages of workers who make mistakes

Answer: B) The costs a firm bears because its quality is poor — rework, scrap, warranty claims and lost customers — COPQ adds up what poor quality costs the firm: fixing defects, replacing goods, handling complaints and losing customers who do not return.

52. What are prevention costs in quality?

  • A) Costs of checking finished goods
  • B) Costs of repairing goods returned by customers
  • C) Costs spent to stop defects happening, such as training, quality planning and better equipment
  • D) Costs of throwing away defective products

Answer: C) Costs spent to stop defects happening, such as training, quality planning and better equipment — Prevention costs are spent before production to avoid defects — for example, training workers or designing a product that is easy to make correctly.

53. What are appraisal costs in quality?

  • A) Costs of training workers
  • B) Costs of replacing goods under warranty
  • C) Costs of checking and measuring quality, such as inspection, testing and audits
  • D) Costs of redesigning a faulty product

Answer: C) Costs of checking and measuring quality, such as inspection, testing and audits — Appraisal costs pay for finding defects — inspectors, test equipment and quality audits — so faulty goods are caught before they reach customers.

54. What are internal failure costs in quality?

  • A) Costs of defects found before delivery, such as rework, scrap and retesting
  • B) Costs of defects found by customers after delivery
  • C) Costs of advertising a product
  • D) Costs of training new workers

Answer: A) Costs of defects found before delivery, such as rework, scrap and retesting — Internal failure costs arise when defects are caught inside the firm: the work must be done again, materials are scrapped, and time is lost.

55. What are external failure costs in quality?

  • A) Costs of checking goods in the factory
  • B) Costs of training workers to avoid defects
  • C) Costs of buying better machines
  • D) Costs of defects found by customers after delivery, such as warranty claims, returns and lost sales

Answer: D) Costs of defects found by customers after delivery, such as warranty claims, returns and lost sales — External failure costs are the most expensive kind: returned goods, repairs under warranty, compensation and customers who never come back.

56. What is quality function deployment (QFD)?

  • A) A method for firing workers who make defects
  • B) A method that turns what customers want into the design features and production steps that deliver it
  • C) A method for counting defective products
  • D) A method for setting the price of a product

Answer: B) A method that turns what customers want into the design features and production steps that deliver it — QFD starts from the voice of the customer and works through design and production, so every feature of the product links back to a customer need.

57. What is the House of Quality in QFD?

  • A) A building where quality inspectors work
  • B) A matrix that links customer needs with design features, showing how strongly each feature satisfies each need
  • C) A chart that shows the cost of quality
  • D) A list of quality standards for a factory

Answer: B) A matrix that links customer needs with design features, showing how strongly each feature satisfies each need — The House of Quality is the main tool of QFD: customer needs run down one side, design features across the top, and the matrix shows which features matter most.

58. What is Taguchi's loss function in quality?

  • A) A method for counting how many products are lost in a factory
  • B) A chart that shows the cost of raw materials
  • C) The idea that any departure from the target value of a product causes a loss to society, and the loss grows with the square of the distance from target
  • D) A rule that says defects should be ignored if they are small

Answer: C) The idea that any departure from the target value of a product causes a loss to society, and the loss grows with the square of the distance from target — Taguchi argued that quality loss is not just about passing or failing limits — even small moves away from the target cost money, so products should be made as close to target as possible.

59. What is the acceptable quality level (AQL)?

  • A) The best quality a firm can ever reach
  • B) The number of products a firm must make each day
  • C) The worst quality level, in defects per hundred, that a buyer will still accept in a batch
  • D) The price a customer will accept for a product

Answer: C) The worst quality level, in defects per hundred, that a buyer will still accept in a batch — AQL is agreed in advance between buyer and seller: if a sample shows defects at or below the AQL, the batch is accepted; above it, the batch is rejected.

60. How do producer's risk and consumer's risk differ in acceptance sampling?

  • A) Producer's risk is about price and consumer's risk is about quality
  • B) Producer's risk applies to services and consumer's risk to goods
  • C) Producer's risk is always larger than consumer's risk
  • D) Producer's risk is rejecting a good batch by mistake, while consumer's risk is accepting a bad batch by mistake

Answer: D) Producer's risk is rejecting a good batch by mistake, while consumer's risk is accepting a bad batch by mistake — Sampling can mislead: producer's risk (alpha) means good work is rejected and money is wasted, while consumer's risk (beta) means bad work is accepted and customers suffer.

61. What is the operating characteristic curve (OC curve) in quality?

  • A) A curve that shows how fast a machine wears out
  • B) A curve that shows, for a sampling plan, the chance of accepting a batch at each level of quality
  • C) A curve that shows the price of a product over time
  • D) A curve that shows how many workers are needed each day

Answer: B) A curve that shows, for a sampling plan, the chance of accepting a batch at each level of quality — The OC curve plots quality on one axis and the probability of acceptance on the other, so buyers and sellers can see how strict a sampling plan really is.

62. What is DMADV in Six Sigma?

  • A) A method for counting defects in a finished product
  • B) A type of control chart
  • C) Define, Measure, Analyse, Design, Verify — the method for designing a new product or process that meets Six Sigma quality
  • D) A method for training workers

Answer: C) Define, Measure, Analyse, Design, Verify — the method for designing a new product or process that meets Six Sigma quality — DMADV is used when a new process or product is designed from scratch, while DMAIC is used to improve a process that already exists.

63. What is process capability in quality?

  • A) How many products a process can make in a day
  • B) How well a process can produce output within the specification limits, compared with what the customer requires
  • C) How much a process costs to run
  • D) How many workers a process needs

Answer: B) How well a process can produce output within the specification limits, compared with what the customer requires — Process capability compares the natural variation of a process with the allowed limits; a capable process makes almost everything inside the limits.

64. What is DPMO in Six Sigma?

  • A) The number of products made per minute
  • B) Defects per million opportunities — the number of defects expected in one million chances for a defect to occur
  • C) The cost of each defect found
  • D) The number of workers per machine

Answer: B) Defects per million opportunities — the number of defects expected in one million chances for a defect to occur — DPMO measures quality on a common scale: Six Sigma quality means about 3.4 defects per million opportunities.

65. What is design capacity in operations?

  • A) The output a facility actually produces each day
  • B) The number of workers a facility employs
  • C) The cost of building a facility
  • D) The maximum output a facility is designed to produce under ideal conditions

Answer: D) The maximum output a facility is designed to produce under ideal conditions — Design capacity is the theoretical top output — for example, a plant designed for 1,000 units a day — before allowing for maintenance, breaks or demand.

66. What is effective capacity in operations?

  • A) The maximum output a facility can realistically sustain, allowing for maintenance, breaks and normal delays
  • B) The output a facility produced last year
  • C) The cheapest output a facility can produce
  • D) The capacity of the largest machine only

Answer: A) The maximum output a facility can realistically sustain, allowing for maintenance, breaks and normal delays — Effective capacity is lower than design capacity because real operations lose time to maintenance, changeovers and worker breaks.

67. What is a capacity cushion in operations?

  • A) A soft seat for machine operators
  • B) Money kept aside for buying new machines
  • C) The difference between design capacity and effective capacity
  • D) Extra capacity kept above expected demand, so the operation can cope with sudden rises in orders

Answer: D) Extra capacity kept above expected demand, so the operation can cope with sudden rises in orders — A capacity cushion is spare room — for example, keeping 20 percent of capacity free — so unexpected demand or breakdowns do not cause long waits.

68. What is capacity timing in operations?

  • A) Deciding what time of day machines should run
  • B) Deciding when to add capacity — ahead of demand (leading), after demand appears (lagging), or in step with it (average)
  • C) Deciding how long a machine should last
  • D) Deciding when workers should take holidays

Answer: B) Deciding when to add capacity — ahead of demand (leading), after demand appears (lagging), or in step with it (average) — Leading timing builds capacity early and risks idle machines; lagging timing waits and risks lost sales; average timing adds capacity in step with demand.

69. What is a periodic review system in inventory control?

  • A) Checking stock levels at fixed intervals, such as every week, and ordering enough to bring stock up to a target level
  • B) Checking stock only when it runs out
  • C) Checking stock every minute of the day
  • D) Checking stock once a year

Answer: A) Checking stock levels at fixed intervals, such as every week, and ordering enough to bring stock up to a target level — In a periodic review system, orders are placed on a schedule — for example, every Monday — and the order size varies with how much was used.

Operations Strategy and Current Issues

70. What is a continuous review system in inventory control?

  • A) Watching stock levels all the time and ordering a fixed quantity as soon as stock falls to the reorder point
  • B) Reviewing stock once a month
  • C) Counting stock only at the end of the year
  • D) Ordering stock at random times

Answer: A) Watching stock levels all the time and ordering a fixed quantity as soon as stock falls to the reorder point — A continuous review system tracks every issue and receipt, so an order is triggered the moment stock hits the reorder point, keeping stock low and service high.

71. What is a min-max system in inventory control?

  • A) A system that keeps stock at the minimum possible level at all times
  • B) A system that orders the maximum possible quantity every time
  • C) A system that only works for very expensive items
  • D) A system that orders when stock falls to a minimum level, bringing it back up to a maximum level

Answer: D) A system that orders when stock falls to a minimum level, bringing it back up to a maximum level — The min-max system sets two levels: when stock drops to the minimum, an order is placed to bring it back to the maximum, so stock stays within safe bounds.

72. What is a fixed-order-quantity system in inventory control?

  • A) A system that orders a different quantity every time
  • B) A system that orders only once a year
  • C) A system that never orders more stock
  • D) A system that orders the same quantity every time stock reaches the reorder point, while the time between orders varies

Answer: D) A system that orders the same quantity every time stock reaches the reorder point, while the time between orders varies — In a fixed-order-quantity system, such as EOQ-based ordering, the amount ordered is always the same, but orders happen whenever stock runs low, so timing varies with demand.

73. What is autonomous maintenance in operations?

  • A) Maintenance done by robots with no people involved
  • B) Maintenance that is never planned
  • C) Maintenance done only after a machine breaks down
  • D) Maintenance carried out by the machine operators themselves, such as cleaning, lubricating and checking their own equipment

Answer: D) Maintenance carried out by the machine operators themselves, such as cleaning, lubricating and checking their own equipment — Autonomous maintenance, a pillar of TPM, gives operators basic care of their machines, so small problems are found early and specialists handle only bigger work.

74. What is reliability-centred maintenance (RCM)?

  • A) A method that replaces every part on a fixed date
  • B) A method that never maintains machines
  • C) A method that only fixes machines after they break
  • D) A method that chooses the maintenance task for each part based on how it can fail and what happens if it does

Answer: D) A method that chooses the maintenance task for each part based on how it can fail and what happens if it does — RCM studies each failure mode and its consequences, then picks the right task — inspection, replacement or redesign — so effort goes where failure matters most.

75. What is condition-based maintenance in operations?

  • A) Maintaining equipment on a fixed calendar date whatever its condition
  • B) Maintaining equipment when monitoring shows it needs it, such as when vibration or temperature passes a limit
  • C) Maintaining equipment only after it has broken down
  • D) Maintaining equipment that is in perfect condition

Answer: B) Maintaining equipment when monitoring shows it needs it, such as when vibration or temperature passes a limit — Condition-based maintenance uses sensors and checks to watch the real state of a machine, so work is done when needed — not too early and not too late.

76. What is operations strategy?

  • A) The long-term plan for how operations will support the firm's competitive strategy, through choices on capacity, technology, quality and organisation
  • B) The daily schedule for machines
  • C) A plan for selling more products
  • D) A list of the firm's competitors

Answer: A) The long-term plan for how operations will support the firm's competitive strategy, through choices on capacity, technology, quality and organisation — Operations strategy turns business strategy into decisions about what the operation must do well — for example, low cost or fast delivery — and how it will be organised to do it.

77. What are global operations?

  • A) Operations that only sell in one country
  • B) Operations that use the internet to sell goods
  • C) Operations that span several countries, with factories, suppliers and customers in different parts of the world
  • D) Operations that make products for the whole world from one factory

Answer: C) Operations that span several countries, with factories, suppliers and customers in different parts of the world — Global operations must deal with different laws, cultures, currencies and transport, but they can put each part of the work where it is done best or cheapest.

78. What are green operations?

  • A) Operations that paint their factories green
  • B) Operations that only make green-coloured products
  • C) Operations that work in the countryside
  • D) Operations run in a way that reduces harm to the environment, such as cutting waste, energy and emissions

Answer: D) Operations run in a way that reduces harm to the environment, such as cutting waste, energy and emissions — Green operations cut pollution and resource use — for example, by recycling, using less packaging and choosing cleaner energy.

79. What are sustainable operations?

  • A) Operations that never change
  • B) Operations that make a profit every year
  • C) Operations that meet today's needs without harming the ability of future generations to meet theirs, balancing profit, people and planet
  • D) Operations that use only solar power

Answer: C) Operations that meet today's needs without harming the ability of future generations to meet theirs, balancing profit, people and planet — Sustainable operations look beyond the environment to workers, communities and long-term profit, so the business can keep going without damaging society or nature.

80. What are digital operations?

  • A) Operations that only sell digital products
  • B) Operations that have no workers at all
  • C) Operations that use digital tools — sensors, data, software and automation — to plan, run and improve work
  • D) Operations that use paper records

Answer: C) Operations that use digital tools — sensors, data, software and automation — to plan, run and improve work — Digital operations connect machines, stock and orders through data, so managers can see what is happening live and react faster.

81. What is Industry 4.0?

  • A) A new type of factory building
  • B) A law about industrial safety
  • C) A method for counting products
  • D) The fourth industrial revolution, in which factories use cyber-physical systems, the Internet of Things, big data and artificial intelligence

Answer: D) The fourth industrial revolution, in which factories use cyber-physical systems, the Internet of Things, big data and artificial intelligence — Industry 4.0 links smart machines, sensors and software so factories can adapt, predict faults and make custom products at mass-production cost.

82. What is operations resilience?

  • A) The ability of an operation to make products very cheaply
  • B) The ability of an operation to keep working, or recover quickly, when a disruption such as a flood, war or supplier failure hits
  • C) The ability of workers to work long hours
  • D) The ability of a firm to borrow money in a crisis

Answer: B) The ability of an operation to keep working, or recover quickly, when a disruption such as a flood, war or supplier failure hits — Resilient operations have backup suppliers, spare capacity and clear plans, so a shock causes a short pause rather than a long stop.

83. What is operations agility?

  • A) The ability of an operation to respond quickly to change, such as new demand, new products or new technology
  • B) The ability of workers to move quickly around a factory
  • C) The ability of a machine to run at high speed
  • D) The ability of a firm to change its name

Answer: A) The ability of an operation to respond quickly to change, such as new demand, new products or new technology — Agile operations can switch products, volumes or suppliers fast, which matters when markets change suddenly.

84. What is postponement in operations?

  • A) Delaying delivery to customers on purpose
  • B) Putting off maintenance until machines break
  • C) Delaying the final customisation of a product until a customer order arrives, so standard parts are held and finished to order
  • D) Delaying payment to suppliers

Answer: C) Delaying the final customisation of a product until a customer order arrives, so standard parts are held and finished to order — Postponement, used for computers and paint, keeps products unfinished and generic, then adds the final features — colour, memory, language — when the order comes in.

85. What is quick response in operations?

  • A) Answering customer complaints within one hour
  • B) Making products as fast as possible whatever the cost
  • C) A system in which sales data is shared quickly with suppliers and makers, so stock is replenished fast and in line with real demand
  • D) Delivering every order on the same day

Answer: C) A system in which sales data is shared quickly with suppliers and makers, so stock is replenished fast and in line with real demand — Quick response links shops, warehouses and suppliers through shared sales data, so the right goods are made and moved before shelves go empty.

86. What is a cobot in operations?

  • A) A collaborative robot designed to work safely alongside people, sharing tasks rather than replacing workers
  • B) A robot that works alone in a locked cage
  • C) A computer that controls a factory
  • D) A small machine that cleans floors

Answer: A) A collaborative robot designed to work safely alongside people, sharing tasks rather than replacing workers — Cobots are light, sensor-fitted robots that stop on contact, so people and robots can work side by side on assembly or packing.

87. What is an automated guided vehicle (AGV)?

  • A) A driverless vehicle that follows set paths, such as wires or markers, to move materials around a factory or warehouse
  • B) A vehicle driven by a worker
  • C) A truck that delivers goods to customers
  • D) A vehicle that only moves at night

Answer: A) A driverless vehicle that follows set paths, such as wires or markers, to move materials around a factory or warehouse — AGVs carry pallets and parts along fixed routes, cutting the need for forklift drivers and making material flow steady and predictable.

88. What is an autonomous mobile robot (AMR) in operations?

  • A) A robot fixed to one spot on a production line
  • B) A robot that moves freely around a site, planning its own route with sensors and maps, to carry goods or pick orders
  • C) A robot that only works outdoors
  • D) A remote-controlled toy

Answer: B) A robot that moves freely around a site, planning its own route with sensors and maps, to carry goods or pick orders — Unlike AGVs, which follow fixed paths, AMRs navigate around obstacles and people, so they suit busy warehouses where routes change often.

89. What is voice picking in a warehouse?

  • A) A system in which workers shout to each other across the warehouse
  • B) A method for choosing workers by their voice
  • C) A system in which workers wear a headset and hear spoken instructions telling them what to pick, where, and how many
  • D) A way of recording workers' conversations

Answer: C) A system in which workers wear a headset and hear spoken instructions telling them what to pick, where, and how many — Voice picking leaves workers' hands and eyes free, so they pick faster and with fewer errors than with paper lists.

90. What is pick-to-light in warehousing?

  • A) A system in which lights on shelves show pickers which item to take and how many, speeding up order picking
  • B) A system that turns lights on when a worker enters a warehouse
  • C) A method for choosing the brightest warehouse
  • D) A system that picks products by their colour

Answer: A) A system in which lights on shelves show pickers which item to take and how many, speeding up order picking — Pick-to-light guides the picker with a lit display at each location, so the right items are picked quickly and mistakes fall.

91. What is sortation in logistics?

  • A) Sorting workers into teams
  • B) Counting how many parcels arrive each day
  • C) The automated sorting of goods or parcels into the right lanes, orders or destinations as they move along a conveyor
  • D) Storing goods in alphabetical order

Answer: C) The automated sorting of goods or parcels into the right lanes, orders or destinations as they move along a conveyor — Sortation systems read barcodes and divert each item to the correct chute or lorry, which is essential in parcel hubs and e-commerce warehouses.

92. What is a less-than-container load (LCL) shipment?

  • A) A shipment that fills a whole container
  • B) A shipment in which a firm's goods share a container with goods from other firms, because they do not fill a whole container
  • C) A shipment sent by air
  • D) A shipment that is never delivered

Answer: B) A shipment in which a firm's goods share a container with goods from other firms, because they do not fill a whole container — LCL suits small exporters: they pay only for the space their goods use, and the container is shared and split at the destination.

93. What is a full container load (FCL) shipment?

  • A) A shipment in which one firm's goods fill a whole container, which is sealed at the start and opened at the destination
  • B) A shipment that shares a container with other firms
  • C) A shipment sent by road only
  • D) A shipment that is always cheaper than LCL

Answer: A) A shipment in which one firm's goods fill a whole container, which is sealed at the start and opened at the destination — FCL gives one firm the whole container, so goods are handled less, sealed for security, and usually cheaper per unit for large volumes.

94. What is a twenty-foot equivalent unit (TEU)?

  • A) A type of ship
  • B) A tax on containers
  • C) A standard measure of container capacity, equal to one 20-foot container
  • D) A container made of steel

Answer: C) A standard measure of container capacity, equal to one 20-foot container — TEU lets ports and shipping lines compare sizes: a 40-foot container counts as 2 TEU, and a ship's capacity is given in TEU.

95. What is demurrage in shipping?

  • A) A charge for keeping a container at a port or terminal beyond the free time allowed
  • B) A charge for loading a container onto a ship
  • C) The cost of insuring a shipment
  • D) A discount for early delivery

Answer: A) A charge for keeping a container at a port or terminal beyond the free time allowed — Demurrage is the penalty for holding up a container at the terminal; it pushes firms to collect their goods promptly.

96. What is detention in shipping?

  • A) A charge for keeping a container outside the port or terminal beyond the free time allowed
  • B) A charge for delaying a ship at sea
  • C) The cost of a customs inspection
  • D) A fine for sending goods late

Answer: A) A charge for keeping a container outside the port or terminal beyond the free time allowed — Detention applies once a container has left the terminal — for example, if it is kept at a warehouse too long — while demurrage applies inside the terminal.

97. What is a flat-rack container?

  • A) A container that is completely flat when empty
  • B) A container used only for liquids
  • C) A container that is always carried on deck
  • D) A container with no sides or roof, used for wide, tall or heavy cargo that does not fit in a standard box

Answer: D) A container with no sides or roof, used for wide, tall or heavy cargo that does not fit in a standard box — Flat-racks carry machinery, vehicles and large pipes, which are loaded from the top or side and lashed down for the voyage.

98. What is a dry port?

  • A) A port with no water
  • B) A warehouse that stores only dry goods
  • C) An inland terminal where containers are handled, stored and cleared through customs, linked to a seaport by rail or road
  • D) A port that is closed in winter

Answer: C) An inland terminal where containers are handled, stored and cleared through customs, linked to a seaport by rail or road — A dry port moves port work inland, so containers are cleared and stored near factories and cities instead of crowding the seaport.

99. What is liner shipping?

  • A) Shipping on regular routes and fixed schedules, like a bus service, where ships sail whether or not they are full
  • B) Shipping that only carries one type of cargo
  • C) Shipping arranged for a single voyage
  • D) Shipping by small boats along a coast

Answer: A) Shipping on regular routes and fixed schedules, like a bus service, where ships sail whether or not they are full — Liner shipping runs container ships on set timetables between fixed ports, so shippers can plan around known sailing dates.

100. What is an ATA carnet?

  • A) A ticket for travelling by air
  • B) An international customs document that lets goods such as samples and exhibition equipment travel temporarily to other countries without paying duty
  • C) A licence to open a factory abroad
  • D) A certificate that proves goods were made locally

Answer: B) An international customs document that lets goods such as samples and exhibition equipment travel temporarily to other countries without paying duty — An ATA carnet acts as a passport for goods: it covers temporary exports such as trade-fair displays, so no duty is paid at each border.

How many did you get right? Share your score in the comments!