Project management is the work of turning an idea into a finished result on time, within budget and to the right quality. Every new building, software system, event and business change is a project, and how well it is planned, run and controlled decides whether it succeeds or fails.
This set of 100 multiple choice questions covers project management from start to finish. You will find questions on the fundamentals of projects and project selection, on planning and scheduling, on execution, monitoring and control, and on project teams, risk and current issues such as artificial intelligence and green project management.
Each question has four options and one correct answer, followed by a short explanation. Read each question carefully, choose your answer, and then check the explanation to learn why it is right. These questions will help students, job seekers and working professionals who want to understand how projects are planned, run and controlled.
Project Management Fundamentals
1. What is project governance?
- A) The daily tasks of the project team
- B) The framework of rules, roles and decisions that guides and oversees a project
- C) The software used to draw a project schedule
- D) The list of risks in a project
Answer: B) The framework of rules, roles and decisions that guides and oversees a project — Project governance sets who decides what, who is accountable and how the project is overseen.
2. What is a project board?
- A) A whiteboard used for daily tasks
- B) A group of senior managers who guide a project and take its big decisions
- C) A chart that shows the project schedule
- D) A list of all project documents
Answer: B) A group of senior managers who guide a project and take its big decisions — A project board gives direction, approves key decisions and supports the project manager.
3. What are project success criteria?
- A) The list of people working on a project
- B) The risks that a project must avoid
- C) The tools used to plan a project
- D) The agreed measures used to judge whether a project has succeeded, such as time, cost, quality and benefits
Answer: D) The agreed measures used to judge whether a project has succeeded, such as time, cost, quality and benefits — Success criteria are agreed at the start, so everyone knows what success looks like.
4. What are critical success factors in a project?
- A) The few key things that must go right for the project to succeed
- B) The reasons a project is cancelled
- C) The documents signed at the end of a project
- D) The costs that cannot be controlled
Answer: A) The few key things that must go right for the project to succeed — Critical success factors are the small number of areas where good results are essential.
5. What is a project management maturity model?
- A) A chart that shows the age of each project
- B) A list of project risks
- C) A scale that shows how advanced an organisation's project management skills and habits are
- D) A method for hiring project managers
Answer: C) A scale that shows how advanced an organisation's project management skills and habits are — A maturity model helps a business see where its project management is weak and what to improve.
6. What is OPM3?
- A) A software tool for drawing Gantt charts
- B) The Project Management Institute's model for judging how mature an organisation's project management is
- C) A method for estimating project costs
- D) A type of project contract
Answer: B) The Project Management Institute's model for judging how mature an organisation's project management is — OPM3 stands for Organizational Project Management Maturity Model, and it measures capability against best practice.
7. What is a project management information system (PMIS)?
- A) A meeting where the project team shares news
- B) The software and tools used to collect, store and share project information
- C) A document that lists project risks
- D) A method for testing a product
Answer: B) The software and tools used to collect, store and share project information — A PMIS keeps schedules, costs, documents and reports in one place where the team can use them.
8. What are enterprise environmental factors in a project?
- A) The tools bought for the project team
- B) Conditions outside the project team's control, such as laws, market conditions and company culture, that affect the project
- C) The risks written in the risk register
- D) The skills of the project manager
Answer: B) Conditions outside the project team's control, such as laws, market conditions and company culture, that affect the project — Enterprise environmental factors cannot be changed by the project, but the plan must allow for them.
9. What are organisational process assets in a project?
- A) The money set aside for a project
- B) The machines bought for a project
- C) The plans, procedures, templates and lessons from past projects that a business reuses in a new project
- D) The customers of a project
Answer: C) The plans, procedures, templates and lessons from past projects that a business reuses in a new project — Organisational process assets save time, because a new project starts from what worked before.
10. What is a weighted scoring model in project selection?
- A) A method that picks the cheapest project
- B) A method that scores each proposed project against weighted criteria, such as profit, risk and fit with strategy, and picks the highest score
- C) A method that picks the project the boss likes most
- D) A method that counts the number of tasks in a project
Answer: B) A method that scores each proposed project against weighted criteria, such as profit, risk and fit with strategy, and picks the highest score — A weighted scoring model gives more weight to the criteria that matter most, so the scores reflect real priorities.
11. What is a murder board in project selection?
- A) A board that lists the names of failed projects
- B) A chart that shows project risks
- C) A group of reviewers who challenge a project proposal with hard questions before it is approved
- D) A meeting where the project team is chosen
Answer: C) A group of reviewers who challenge a project proposal with hard questions before it is approved — A murder board tries to find the weak points in a proposal, so only strong projects get approved.
12. What is constrained optimisation in project selection?
- A) A mathematical method that picks the best set of projects within limits such as budget and staff
- B) A method that picks projects by voting
- C) A method that picks the first project proposed
- D) A method that ranks projects by their names
Answer: A) A mathematical method that picks the best set of projects within limits such as budget and staff — Constrained optimisation uses maths to find the best mix of projects that fits the limits.
13. What is project prioritisation?
- A) Listing projects in the order they were proposed
- B) Ranking proposed projects in order of importance so the most valuable ones get resources first
- C) Counting the tasks in each project
- D) Closing projects that are late
Answer: B) Ranking proposed projects in order of importance so the most valuable ones get resources first — Prioritisation makes sure scarce money and people go to the projects that matter most.
14. What is project selection?
- A) Choosing the people for a project team
- B) Choosing which proposed projects a business will fund and carry out
- C) Choosing the software for a project
- D) Choosing the date a project ends
Answer: B) Choosing which proposed projects a business will fund and carry out — Project selection compares proposals on benefits, costs and risks, and funds the best ones.
15. What is a project proposal?
- A) A written document that describes a proposed project, its benefits, costs and risks, so managers can decide whether to approve it
- B) A list of tasks for the project team
- C) A contract signed with a supplier
- D) A report written after a project ends
Answer: A) A written document that describes a proposed project, its benefits, costs and risks, so managers can decide whether to approve it — A project proposal gives decision makers the facts they need to approve or reject the idea.
16. What is a statement of work (SOW)?
- A) A list of the project's risks
- B) A document that describes the work a project or a supplier must deliver, including what is included and what is not
- C) A chart that shows the project schedule
- D) A record of the project's costs
Answer: B) A document that describes the work a project or a supplier must deliver, including what is included and what is not — A statement of work sets out the work in words, so both sides agree on what must be delivered.
Project Planning and Scheduling
17. What is the Project Management Institute (PMI)?
- A) A company that sells project software
- B) A government office that funds projects
- C) A worldwide professional body for project managers that sets standards and offers certifications
- D) A university that teaches engineering
Answer: C) A worldwide professional body for project managers that sets standards and offers certifications — PMI is the largest professional body for project management, with members in most countries.
18. How does a project differ from operations?
- A) A project is temporary and creates something new, while operations are ongoing and repeat the same work
- B) A project is ongoing and operations are temporary
- C) A project has no budget and operations have a budget
- D) A project is done by one person and operations by a team
Answer: A) A project is temporary and creates something new, while operations are ongoing and repeat the same work — A project ends when its unique result is delivered, while operations keep running the business day after day.
19. What is the waterfall model in project management?
- A) A step-by-step approach in which each phase finishes before the next begins, like water flowing down steps
- B) A method in which the team changes the plan every week
- C) A method that delivers the product in small pieces
- D) A method with no plan at all
Answer: A) A step-by-step approach in which each phase finishes before the next begins, like water flowing down steps — In the waterfall model, work flows in one direction, so a phase is finished before the next starts.
20. What is an iterative life cycle?
- A) A life cycle with one long phase and no feedback
- B) A life cycle in which the plan never changes
- C) A life cycle used only for building houses
- D) A life cycle in which the product is built and improved through repeated cycles, with feedback after each cycle
Answer: D) A life cycle in which the product is built and improved through repeated cycles, with feedback after each cycle — Each iteration produces a better version of the product, using what was learned in the last cycle.
21. What is an incremental life cycle?
- A) A life cycle in which nothing is delivered until the very end
- B) A life cycle with no planning
- C) A life cycle that repeats the same work forever
- D) A life cycle in which the product is delivered in small, usable pieces, one part at a time
Answer: D) A life cycle in which the product is delivered in small, usable pieces, one part at a time — In an incremental life cycle, each piece works on its own, so users get value early.
22. What are project constraints?
- A) The skills of the project team
- B) The tools used in a project
- C) Limits that a project must work within, such as time, cost, scope and quality
- D) The customers of a project
Answer: C) Limits that a project must work within, such as time, cost, scope and quality — Constraints are the boundaries of a project, and the plan must fit inside them.
23. What are project objectives?
- A) The names of the people on the project team
- B) The risks that might stop a project
- C) The software used to plan a project
- D) The specific results a project must achieve, stated clearly so success can be judged
Answer: D) The specific results a project must achieve, stated clearly so success can be judged — Clear objectives say exactly what the project must deliver, so everyone works towards the same result.
24. What is a project management methodology?
- A) A single software tool for projects
- B) A list of project risks
- C) A set of methods, rules and practices that guides how projects are planned and run
- D) A meeting held every day
Answer: C) A set of methods, rules and practices that guides how projects are planned and run — A methodology gives a team a common way of working, so projects are run in a consistent way.
25. Which 1940s project is often cited as one of the earliest examples of large-scale project management?
- A) The Apollo Moon landing, which happened in the 1960s
- B) The Sydney Opera House, which was built in the 1970s
- C) The Manhattan Project, which built the first atomic bomb in the 1940s
- D) The Burj Khalifa, which was built in the 2000s
Answer: C) The Manhattan Project, which built the first atomic bomb in the 1940s — The Manhattan Project brought together thousands of people, huge budgets and tight secrecy, and is studied as an early giant project.
26. What is a schedule model in project management?
- A) A model that shows the planned dates for project work, built from activities, durations and dependencies, and used to predict the finish date
- B) A list of the people on a project
- C) A chart that shows project costs
- D) A document that lists project risks
Answer: A) A model that shows the planned dates for project work, built from activities, durations and dependencies, and used to predict the finish date — The schedule model brings the plan together, so the team can see when work starts, when it ends and what affects the finish date.
27. What is a project calendar?
- A) A calendar that shows the birthdays of team members
- B) A list of project meetings
- C) A calendar that shows the working days and hours when project work can be done, including holidays and shutdowns
- D) A chart that shows project costs
Answer: C) A calendar that shows the working days and hours when project work can be done, including holidays and shutdowns — The project calendar sets the working time, so activity dates fall only on days when work is allowed.
28. What is a resource calendar?
- A) A calendar that shows when each person or machine is available to work on the project
- B) A calendar that shows the project's finish date
- C) A list of project risks
- D) A chart that shows the project budget
Answer: A) A calendar that shows when each person or machine is available to work on the project — A resource calendar records holidays, shifts and other work, so no one is booked when they are not free.
29. What is an activity list in a project?
- A) A list of all the work activities that must be done to complete the project
- B) A list of the people on the project team
- C) A list of the project's costs
- D) A list of the project's risks
Answer: A) A list of all the work activities that must be done to complete the project — The activity list breaks the project work into named activities that can be scheduled and tracked.
30. What are activity attributes?
- A) The costs of each activity
- B) The risks of each activity
- C) The details that describe each activity, such as who does it, where it happens and what it needs
- D) The names of the project managers
Answer: C) The details that describe each activity, such as who does it, where it happens and what it needs — Activity attributes add the detail behind each activity, such as its owner, place and needs.
31. How does effort differ from duration in a project?
- A) Effort and duration are exactly the same thing
- B) Effort is the amount of work a task needs, while duration is the calendar time from start to finish
- C) Effort is the calendar time and duration is the amount of work
- D) Effort applies only to machines and duration only to people
Answer: B) Effort is the amount of work a task needs, while duration is the calendar time from start to finish — A task can need 8 hours of effort spread over 4 days of duration, if the worker is only free 2 hours a day.
32. What is a rough order of magnitude (ROM) estimate?
- A) A final, exact estimate made at the end of a project
- B) A very early, rough cost or time estimate made when little is known, usually accurate only within about 25 to 75 percent
- C) A list of all project costs
- D) A method for hiring project staff
Answer: B) A very early, rough cost or time estimate made when little is known, usually accurate only within about 25 to 75 percent — A ROM estimate is a ballpark figure used at the start, before enough detail exists for a better estimate.
33. What is a budgetary estimate?
- A) An estimate made after the project ends
- B) A list of project risks
- C) An estimate made to set the project budget, usually accurate within about 10 to 25 percent
- D) A method for choosing a project manager
Answer: C) An estimate made to set the project budget, usually accurate within about 10 to 25 percent — A budgetary estimate is good enough to approve funding, though the final cost may still move by up to a quarter.
34. What is a definitive estimate?
- A) A rough guess made at the start of a project
- B) A list of project meetings
- C) A method for closing a project
- D) A detailed estimate based on full information, usually accurate within about 5 to 10 percent
Answer: D) A detailed estimate based on full information, usually accurate within about 5 to 10 percent — A definitive estimate uses detailed plans and prices, so it is the most accurate kind of estimate.
Project Execution, Monitoring and Control
35. What does estimate accuracy mean in project management?
- A) How close an estimate is likely to be to the real cost or time, shown as a range such as minus 10 to plus 25 percent
- B) The number of estimates made in a project
- C) The cost of making an estimate
- D) The time taken to write an estimate
Answer: A) How close an estimate is likely to be to the real cost or time, shown as a range such as minus 10 to plus 25 percent — Estimate accuracy is given as a range, because early estimates carry more uncertainty than late ones.
36. What is life cycle costing in a project?
- A) Counting only the cost of the project team
- B) Counting only the cost of materials
- C) Counting all the costs of a product over its whole life, building it, using it and disposing of it, not just the project cost
- D) Counting the cost of a project after it ends
Answer: C) Counting all the costs of a product over its whole life, building it, using it and disposing of it, not just the project cost — Life cycle costing looks past the project, so a cheap product that is costly to run is not wrongly chosen.
37. What is value engineering in a project?
- A) Raising the price of a product
- B) Adding extra features to a product
- C) Finding cheaper ways to deliver the same function and quality, without cutting what the product must do
- D) Cutting the quality of a product to save money
Answer: C) Finding cheaper ways to deliver the same function and quality, without cutting what the product must do — Value engineering asks how to get the same result for less money, by changing materials or methods, not by cutting quality.
38. What is a project budget?
- A) The list of people on a project
- B) The schedule of a project
- C) The risks of a project
- D) The total amount of money approved to complete the project
Answer: D) The total amount of money approved to complete the project — The project budget is the spending limit, and the project manager must deliver inside it.
39. What is a planning package in a project?
- A) A box of tools for the project team
- B) A part of the work breakdown that is planned in less detail now and will be broken down further later
- C) A list of project risks
- D) A document that closes a project
Answer: B) A part of the work breakdown that is planned in less detail now and will be broken down further later — A planning package holds future work at a high level until enough is known to plan it in detail.
40. What is work authorisation in a project?
- A) A list of project risks
- B) Formal permission that tells a team or worker to start a piece of project work
- C) A chart that shows the project schedule
- D) A report written at the end of a project
Answer: B) Formal permission that tells a team or worker to start a piece of project work — Work authorisation makes sure no one starts work before it is approved and funded.
41. What is the MoSCoW method in requirements?
- A) A way to rank requirements as Must have, Should have, Could have or Won't have this time
- B) A method for estimating project costs
- C) A method for drawing a project schedule
- D) A method for hiring project staff
Answer: A) A way to rank requirements as Must have, Should have, Could have or Won't have this time — MoSCoW sorts requirements by need, so the team builds the must-haves first and drops the rest if time runs out.
42. What is a requirements workshop?
- A) A meeting where the project budget is set
- B) A meeting where risks are listed
- C) A meeting where the project is closed
- D) A meeting where stakeholders work together to agree on what a project must deliver
Answer: D) A meeting where stakeholders work together to agree on what a project must deliver — In a requirements workshop, stakeholders discuss and agree the needs together, instead of answering one by one.
43. What is a context diagram in a project?
- A) A chart that shows project costs
- B) A list of project risks
- C) A simple drawing that shows a product or system and how it connects with the people and systems around it
- D) A schedule of project meetings
Answer: C) A simple drawing that shows a product or system and how it connects with the people and systems around it — A context diagram draws the boundary of the product and shows everything it talks to.
44. What is a near-critical path in a project?
- A) A chain of activities that is almost as long as the critical path, so a small delay could make it critical
- B) The shortest chain of activities in a project
- C) A path that is never used
- D) A list of project risks
Answer: A) A chain of activities that is almost as long as the critical path, so a small delay could make it critical — A near-critical path needs watching, because a small slip can turn it into the path that decides the finish date.
45. What is negative float in a project schedule?
- A) When an activity has plenty of spare time
- B) When an activity is not on the critical path
- C) When an activity has not started yet
- D) When an activity is already behind, because its late finish date is earlier than its planned finish date
Answer: D) When an activity is already behind, because its late finish date is earlier than its planned finish date — Negative float means the schedule cannot be met as planned, so the plan must change.
46. What is the planning fallacy in project management?
- A) The habit of overestimating project costs
- B) The habit of underestimating how long a task will take, even when past tasks took longer
- C) A method for planning a project
- D) A tool for drawing a schedule
Answer: B) The habit of underestimating how long a task will take, even when past tasks took longer — The planning fallacy makes people plan for the best case and ignore how long similar work took before.
47. What is student syndrome in project scheduling?
- A) Studying for an exam during a project
- B) Hiring students for a project team
- C) Training new staff on a project
- D) Waiting until the last moment to start a task, even though time was available earlier
Answer: D) Waiting until the last moment to start a task, even though time was available earlier — Student syndrome wastes the safety time built into a task, so any problem then makes it late.
48. What is bad multitasking in a project?
- A) Doing two tasks at exactly the same time
- B) Working on a project with a large team
- C) Using two computers at once
- D) Switching often between tasks, which wastes time and delays every task
Answer: D) Switching often between tasks, which wastes time and delays every task — Every switch costs time to stop, restart and remember where the work was, so all tasks finish later.
49. What are funding requirements in a project?
- A) The amounts of money a project needs, and when each amount is needed
- B) The list of people who fund a project
- C) The risks of a project
- D) The tools used in a project
Answer: A) The amounts of money a project needs, and when each amount is needed — Funding requirements show the cash flow of the project, so money is ready when each part of the work starts.
50. What are project assumptions?
- A) The facts that are already proven about a project
- B) The risks that have already happened
- C) Things the project team believes to be true while planning, even though they are not yet proven
- D) The costs that are already spent
Answer: C) Things the project team believes to be true while planning, even though they are not yet proven — Assumptions fill the gaps in knowledge at planning time, and must be checked because a wrong one can break the plan.
51. What is a change control board (CCB)?
- A) A board that lists all project changes
- B) A group of people who review change requests and decide whether to approve or reject them
- C) A software tool for drawing schedules
- D) A meeting where the project team is chosen
Answer: B) A group of people who review change requests and decide whether to approve or reject them — A change control board stops uncontrolled changes, by making one group decide on every request.
52. What is a change log in a project?
- A) A list of project risks
- B) A chart that shows project costs
- C) A record of every change request, its status and the decision made on it
- D) A list of team members
Answer: C) A record of every change request, its status and the decision made on it — The change log keeps the history of changes, so anyone can see what was asked, decided and done.
53. What is a preventive action in a project?
- A) A step taken to fix a problem after it happens
- B) A step taken to close a project
- C) A step taken to stop a possible problem before it happens
- D) A step taken to hire new staff
Answer: C) A step taken to stop a possible problem before it happens — Preventive action deals with a risk before it becomes a problem, instead of waiting for damage.
54. What is defect repair in a project?
- A) Preventing a problem before it happens
- B) Closing a project early
- C) Changing the project plan
- D) Fixing a product or part that does not meet its requirements
Answer: D) Fixing a product or part that does not meet its requirements — Defect repair corrects a fault found during checking, so the product meets what was asked for.
55. What is an exception report in a project?
- A) A report written only when something goes wrong or goes off plan, to alert managers
- B) A report written every week about progress
- C) A list of project risks
- D) A chart that shows the project budget
Answer: A) A report written only when something goes wrong or goes off plan, to alert managers — An exception report is written by exception, so managers hear only when action is needed.
56. What is a project dashboard?
- A) A single screen that shows the key facts about a project, such as progress, costs and risks, at a glance
- B) A list of all project documents
- C) A meeting held every day
- D) A tool for hiring project staff
Answer: A) A single screen that shows the key facts about a project, such as progress, costs and risks, at a glance — A dashboard turns project data into simple visuals, so managers can see the health of the project in seconds.
57. What is a project health check?
- A) A short, independent review that asks whether a project is on track and likely to succeed
- B) A medical check for the project team
- C) A test of the project's software
- D) A list of project risks
Answer: A) A short, independent review that asks whether a project is on track and likely to succeed — A health check is done by someone outside the team, so problems are spotted honestly and early.
58. What is a phase gate in a project?
- A) A door that closes a project office
- B) A list of project risks
- C) A chart that shows the project schedule
- D) A decision point at the end of a phase, where managers decide whether the project should continue, change or stop
Answer: D) A decision point at the end of a phase, where managers decide whether the project should continue, change or stop — A phase gate stops a weak project from eating more money, by forcing a go or no-go decision.
59. What is a project kick-off meeting?
- A) A meeting held at the end of a project
- B) A meeting where risks are listed
- C) A meeting where the budget is cut
- D) A meeting at the start of a project or phase where the team agrees on the goals, roles and plan
Answer: D) A meeting at the start of a project or phase where the team agrees on the goals, roles and plan — A kick-off meeting gets everyone aligned on what the project is, who does what and how it will run.
60. What is a project handover?
- A) Passing the finished product or result of a project to the customer or the team that will use and support it
- B) Starting a new project
- C) Closing the project office
- D) Hiring new staff for a project
Answer: A) Passing the finished product or result of a project to the customer or the team that will use and support it — Handover moves the result out of the project and into normal use, with the knowledge needed to run it.
61. How does grade differ from quality in a project?
- A) Grade and quality mean exactly the same thing
- B) Grade is about cost and quality is about time
- C) Grade applies to services and quality to products
- D) Grade is the level of features a product has, while quality is how well it meets its requirements
Answer: D) Grade is the level of features a product has, while quality is how well it meets its requirements — A low-grade product can still be high quality if it does exactly what was promised, and a high-grade product can be poor quality.
62. How does precision differ from accuracy?
- A) Precision means repeated results are close to each other, while accuracy means results are close to the true value
- B) Precision and accuracy mean exactly the same thing
- C) Precision is about cost and accuracy is about time
- D) Precision applies to people and accuracy to machines
Answer: A) Precision means repeated results are close to each other, while accuracy means results are close to the true value — A set of measurements can be precise but wrong, if they all cluster around the wrong value.
63. What is a quality gate in a project?
- A) A door to the quality department
- B) A list of quality risks
- C) A chart that shows project costs
- D) A checkpoint where work is checked against quality standards before it is allowed to move on
Answer: D) A checkpoint where work is checked against quality standards before it is allowed to move on — A quality gate stops faulty work from moving to the next stage, where it would cost more to fix.
64. What is a quality checklist?
- A) A list of project risks
- B) A list of team members
- C) A chart that shows the project schedule
- D) A list of steps or items used to check that work has been done correctly
Answer: D) A list of steps or items used to check that work has been done correctly — A quality checklist turns the checks into a simple list, so nothing is skipped or forgotten.
65. What is design of experiments in project quality?
- A) A method for drawing a project schedule
- B) A method for hiring project staff
- C) A method for closing a project
- D) A planned method that tests several factors at once to find which ones affect quality
Answer: D) A planned method that tests several factors at once to find which ones affect quality — Design of experiments varies several factors together, so the team learns which ones really change the result.
66. How does verification differ from validation?
- A) Verification and validation mean exactly the same thing
- B) Verification is done by customers and validation by the team
- C) Verification checks that the product was built correctly, while validation checks that the right product was built for the customer
- D) Verification checks costs and validation checks time
Answer: C) Verification checks that the product was built correctly, while validation checks that the right product was built for the customer — Verification asks whether the product matches its design, and validation asks whether it solves the customer's problem.
67. What is a quality policy in a project?
- A) The stated intentions and direction of a business on quality, set by senior managers
- B) A list of project risks
- C) A chart that shows project costs
- D) A document that closes a project
Answer: A) The stated intentions and direction of a business on quality, set by senior managers — The quality policy states what quality means to the business, and guides every quality decision.
68. What are quality standards in a project?
- A) The list of people on a project team
- B) The agreed levels of quality that the project's work and products must reach
- C) The schedule of a project
- D) The risks of a project
Answer: B) The agreed levels of quality that the project's work and products must reach — Quality standards set the bar, so the team and the customer agree on what good enough means.
69. What are source selection criteria in procurement?
- A) The list of project risks
- B) The standards used to judge and compare sellers, such as price, experience and technical skill
- C) The chart that shows project costs
- D) The names of the project team
Answer: B) The standards used to judge and compare sellers, such as price, experience and technical skill — Source selection criteria make the choice of seller fair, by scoring every bid against the same standards.
Project Teams, Risk and Current Issues
70. What is a bidder conference in procurement?
- A) A meeting where the project team is chosen
- B) A meeting where all sellers can ask questions about the work before they submit their bids
- C) A meeting where the project is closed
- D) A meeting where risks are listed
Answer: B) A meeting where all sellers can ask questions about the work before they submit their bids — A bidder conference gives every seller the same answers, so all bids are based on the same facts.
71. What is claims administration in procurement?
- A) Listing project risks
- B) Drawing a project schedule
- C) Handling and settling claims, such as a seller asking for more money or time because the work changed
- D) Hiring new staff
Answer: C) Handling and settling claims, such as a seller asking for more money or time because the work changed — Claims administration deals with disputes and extra costs under the contract, so they are settled fairly.
72. What is a request for quotation (RFQ)?
- A) A document asking sellers to propose a full solution
- B) A list of project risks
- C) A chart that shows project costs
- D) A document asking sellers to state their price for clearly defined goods or services
Answer: D) A document asking sellers to state their price for clearly defined goods or services — An RFQ is used when the buyer knows exactly what is needed and only wants the price.
73. What is an invitation for bid (IFB)?
- A) A document that asks sellers to design a product
- B) A document that invites sellers to submit a sealed price bid for clearly defined work
- C) A list of project risks
- D) A chart that shows the project schedule
Answer: B) A document that invites sellers to submit a sealed price bid for clearly defined work — An IFB asks for a sealed bid, so the work goes to the lowest bidder who meets the requirements.
74. What are procurement documents?
- A) The list of project risks
- B) The documents used to invite and judge seller bids, such as requests for proposals, quotations and invitations for bids
- C) The chart that shows project costs
- D) The names of the project team
Answer: B) The documents used to invite and judge seller bids, such as requests for proposals, quotations and invitations for bids — Procurement documents tell sellers what is needed and how their bids will be judged.
75. What is contract administration?
- A) Managing the contract with a seller, checking the work, handling changes and paying for work done
- B) Writing a project plan
- C) Listing project risks
- D) Closing the project office
Answer: A) Managing the contract with a seller, checking the work, handling changes and paying for work done — Contract administration makes sure the seller delivers what was agreed and the buyer pays as agreed.
76. What is a team charter?
- A) A list of project risks
- B) A chart that shows the project schedule
- C) A document that closes a project
- D) A document in which a project team agrees on its values, rules, roles and how it will work together
Answer: D) A document in which a project team agrees on its values, rules, roles and how it will work together — A team charter sets how the team will behave and work, so everyone knows what is expected.
77. What are ground rules for a project team?
- A) The agreed rules about how team members will behave and work together
- B) The rules of the building where the team works
- C) The list of project risks
- D) The chart that shows project costs
Answer: A) The agreed rules about how team members will behave and work together — Ground rules cover things like respect, honesty and meeting behaviour, and the team agrees them together.
78. What is colocation in a project?
- A) Placing team members in different countries
- B) Placing team members in the same place so they can talk and work together easily
- C) A list of project risks
- D) A chart that shows the project schedule
Answer: B) Placing team members in the same place so they can talk and work together easily — Colocation speeds up communication, because a question is answered by turning around, not by email.
79. What are recognition and rewards in a project team?
- A) Ways of punishing team members
- B) A list of project risks
- C) Ways of thanking team members for good work, such as praise, awards or bonuses, to keep them motivated
- D) A chart that shows project costs
Answer: C) Ways of thanking team members for good work, such as praise, awards or bonuses, to keep them motivated — Recognition and rewards show people their work matters, which keeps effort and morale high.
80. What is a project status meeting?
- A) A meeting held only at the end of a project
- B) A list of project risks
- C) A regular meeting where the project team reviews progress, problems and next steps
- D) A chart that shows the project budget
Answer: C) A regular meeting where the project team reviews progress, problems and next steps — A status meeting keeps the team aligned on what is done, what is stuck and what happens next.
81. What is a team performance assessment?
- A) A review of the project budget
- B) A review of how well the project team works together and delivers its work
- C) A list of project risks
- D) A chart that shows the project schedule
Answer: B) A review of how well the project team works together and delivers its work — A team performance assessment looks at the team as a whole, not at single people, and finds what to improve.
82. What is a resource breakdown structure (RBS)?
- A) A chart that shows the project schedule
- B) A list of project risks
- C) A chart that groups project resources by type, such as people, equipment and materials
- D) A list of team members
Answer: C) A chart that groups project resources by type, such as people, equipment and materials — An RBS organises resources into groups, so the team can see what kinds of resources the project needs.
83. What is cultural awareness in project management?
- A) Understanding and respecting the different customs, values and ways of working of people from other cultures
- B) Learning a new language for a project
- C) A list of project risks
- D) A chart that shows project costs
Answer: A) Understanding and respecting the different customs, values and ways of working of people from other cultures — Cultural awareness stops misunderstandings, because what is polite or normal differs between cultures.
84. What is political awareness in project management?
- A) Knowing the politics of a country
- B) Understanding who has power and influence in and around a project, and how decisions are really made
- C) A list of project risks
- D) A chart that shows the project schedule
Answer: B) Understanding who has power and influence in and around a project, and how decisions are really made — Political awareness helps a project manager work with the people who can help or block the project.
85. What is risk tolerance in a project?
- A) The list of all project risks
- B) A method for avoiding all risks
- C) The cost of a risk that happens
- D) The amount of risk a person or business is willing to accept
Answer: D) The amount of risk a person or business is willing to accept — Risk tolerance sets how much uncertainty is acceptable, so the team knows which risks to act on.
86. What is a risk threshold?
- A) The list of all project risks
- B) A method for avoiding all risks
- C) The name of the person who owns a risk
- D) The level of risk at which action must be taken, such as a cost overrun above 10 percent
Answer: D) The level of risk at which action must be taken, such as a cost overrun above 10 percent — A risk threshold is a tripwire, and crossing it means the team must act now.
87. What is a risk owner in a project?
- A) The person who is responsible for watching one risk and carrying out its response
- B) The person who created the risk
- C) The person who pays for the project
- D) The person who lists all the risks
Answer: A) The person who is responsible for watching one risk and carrying out its response — Every risk needs one owner, so someone is always watching it and ready to act.
88. What is a risk trigger?
- A) The cause of every project failure
- B) A list of project risks
- C) A method for avoiding risks
- D) A warning sign that shows a risk is about to happen or has happened
Answer: D) A warning sign that shows a risk is about to happen or has happened — A risk trigger is the signal to act, such as a key supplier missing a delivery date.
89. What is a secondary risk?
- A) A new risk that appears because of a response taken to deal with another risk
- B) A risk that is less important than others
- C) A risk that has already happened
- D) A risk with no owner
Answer: A) A new risk that appears because of a response taken to deal with another risk — A response can create its own problem, and that new problem is a secondary risk.
90. What is a residual risk?
- A) A risk that is ignored
- B) A risk with no owner
- C) A risk that cannot happen
- D) The risk that remains after a response has been carried out
Answer: D) The risk that remains after a response has been carried out — Even a good response rarely removes all risk, and what is left is the residual risk.
91. What is risk urgency?
- A) How big a risk is
- B) How much a risk will cost
- C) How soon a risk needs attention, based on how near its trigger is
- D) Who owns a risk
Answer: C) How soon a risk needs attention, based on how near its trigger is — Risk urgency ranks risks by time, so the ones that could strike soon are handled first.
92. What is a positive risk in a project?
- A) A risk that has already happened
- B) A risk with no owner
- C) An uncertain event that could help the project, also called an opportunity
- D) A risk that is ignored
Answer: C) An uncertain event that could help the project, also called an opportunity — Not all risks are bad, and a positive risk is a chance the project can use to do better.
93. What are the four responses to a positive risk (opportunity)?
- A) Exploit, share, enhance and accept
- B) Avoid, mitigate, transfer and accept
- C) Ignore, delay, hide and forget
- D) Exploit, avoid, transfer and delay
Answer: A) Exploit, share, enhance and accept — Exploit makes the chance certain, share passes part of it to a partner, enhance raises its odds, and accept takes it as it comes.
94. When should a project risk be escalated?
- A) When the risk is outside the project manager's authority and must be handled by a higher level
- B) When the risk is small and easy to fix
- C) When the risk has already happened
- D) When the risk has no owner
Answer: A) When the risk is outside the project manager's authority and must be handled by a higher level — Escalation passes a risk to someone with the power to deal with it, such as senior management.
95. What are the five levels of stakeholder engagement?
- A) Happy, sad, angry, calm and bored
- B) Unaware, resistant, neutral, supportive and leading
- C) High, medium, low, none and unknown
- D) Aware, interested, active, passive and gone
Answer: B) Unaware, resistant, neutral, supportive and leading — The five levels show where each stakeholder stands now, so the team can plan how to move them towards support.
96. What are the three communication methods in a project?
- A) Email, phone and meetings
- B) Verbal, written and silent communication
- C) Interactive, push and pull communication
- D) Fast, slow and normal communication
Answer: C) Interactive, push and pull communication — Interactive communication is a live exchange, push sends information out, and pull lets people fetch it when they need it.
97. What is communication requirements analysis in a project?
- A) Counting the number of emails in a project
- B) Listing project risks
- C) Drawing a project schedule
- D) Working out who needs what project information, when and in what form
Answer: D) Working out who needs what project information, when and in what form — Communication requirements analysis finds the information needs of every stakeholder, so nothing important is missed.
98. How is artificial intelligence used in project management?
- A) To replace all project managers
- B) To write all project documents without review
- C) To predict risks, forecast dates and costs, and help managers make better decisions from project data
- D) To remove the need for a project plan
Answer: C) To predict risks, forecast dates and costs, and help managers make better decisions from project data — AI studies past project data to spot trouble early and forecast the finish date and cost.
99. What is green project management?
- A) Managing projects about the colour green
- B) Managing projects without a budget
- C) Managing projects with no team
- D) Managing projects in a way that reduces harm to the environment and uses resources responsibly
Answer: D) Managing projects in a way that reduces harm to the environment and uses resources responsibly — Green project management cuts waste, saves energy and chooses materials that harm the planet less.
100. What is the Project Management Professional (PMP) certification?
- A) A certificate for marketing managers
- B) A widely recognised certificate from the Project Management Institute that proves a person's project management knowledge and experience
- C) A software tool for drawing schedules
- D) A type of project contract
Answer: B) A widely recognised certificate from the Project Management Institute that proves a person's project management knowledge and experience — The PMP is one of the best known project management certificates, and it needs proven experience plus an exam.
How many did you get right? Share your score in the comments!